Skip to main content
615 Bath, bathroom remodeling in Nashville TN 615-431-3789

Full Bathroom Remodeling

Full bathroom remodeling from the studs out, planned and finished as one project

Layout, plumbing, tile, tub or shower, vanity, lighting and finishes designed together and built in the right order.

Call or text today615-431-3789

Request bathroom remodeling

Tell us what is going on. We will contact you to confirm the details and set up a time to look at the job.

Or call 615-431-3789

By sending this you agree that we may contact you about your project. See our Privacy Policy.

Prefer to type? Text your request to 615-431-3789

Full Bathroom Remodeling

A full bathroom remodel touches almost every trade: demolition, plumbing, electrical, waterproofing, tile, cabinetry, glass and paint. The projects that go well are the ones where all of that is planned together before the first tile comes off the wall.

We remodel full bathrooms for homes across Middle Tennessee, including Nashville homes of every age. We measure, design the layout, choose materials with you, build the room in order and finish it with fixtures, lighting and trim that look like they belong together.

What you get

Done right, from the first walk-through

01

Design and layout

A plan that fits how you use the room, with every fixture placed on purpose.

02

Waterproofing done right

Membranes, slopes and seams built to keep water where it belongs.

03

Coordinated trades

Plumbing, electrical, tile and glass scheduled in the right order.

04

Finishing details

Trim, hardware, lighting and caulk finished cleanly.

The process

How your service comes together

  1. 1

    Plan and select

    We measure, draw the layout and confirm every material.

  2. 2

    Demolish and build

    We take the room to the studs and rebuild it, trade by trade.

  3. 3

    Finish and walk through

    We complete the details and review the room with you.

FAQ

Common questions about full bathroom remodeling

How long does a full bathroom remodel take?

A typical hall bath takes a few weeks. Larger primary suites take longer. We give you a schedule once the plan and selections are final.

Can I use the bathroom during the project?

Not the bathroom being remodeled. We help you plan around another bathroom or a temporary setup.

Do you handle plumbing and electrical work?

Yes. We coordinate qualified trades so one team manages the whole job.

Let us help with your full bathroom remodeling

Call, text or send the form. Tell us which bathroom you are thinking about and what you have in mind, and we will take it from there.

615-431-3789Text